Guide
How to read a Korean OEM quotation, line by line
Two quotes with the same unit price can be USD 1,000 apart once the pump, the carton, the freight and the registration are added. Here is where to look.

What does an itemized quote look like?
A quote from us for 1,000 units of the Peptide Hydration Toner, with every line shown:
Read moreShow less
| Line | Detail | Amount |
|---|---|---|
| Product | Peptide Hydration Toner 100 ml, CERAPANO formula, your brand | |
| Quantity | 1,000 units | |
| Unit price | FOB Korea, USD | $6.32 |
| Product total | 1,000 × $6.32 | $6,320.00 |
| Included | Formula, standard container and cap, one-color label, printed unit carton, label setup | |
| Not included | Designated cap colours or moulds; registration (CPSR, RP, CPNP, MoCRA); freight and duties | |
| Sample fee | USD 150, paid before samples, credited here | −$150.00 |
| Package design (optional) | By our design team | $200.00 |
| Payment | 50% on order, 50% before shipment, T/T | $3,160.00 / $3,160.00 (before credit and design) |
| Lead time | Production 2 to 3 months including containers, after artwork approval | |
| Validity | Stated on every quote | |
| Regulatory | EU: CPSR, Responsible Person, CPNP; quoted at cost on request | Separate |
| Freight | Quoted per shipment | Separate |
Other quantity tiers are shown next to it (300: $7.95; 500: $7.02; 3,000: $5.62; 5,000: $4.73).
1. Unit price and tiers
The unit price is meaningful only with three things attached: the quantity, the currency and the Incoterm. "$6.32" means something different at 300 units than at 1,000, in USD than in KRW, FOB than EXW.
Read moreShow less
Check that the quote shows tiers, not a single number. A quote that gives one price for "1,000 units" without showing 3,000 or 5,000 hides how much of the price is fixed cost. Our private label list has 7 tiers from 300 to 30,000. For OEM and ODM, ask for at least two tiers.
Check whether the tier is per SKU or total. Ours is per SKU: 300 toners and 300 creams are each priced at the 300 tier.
2. Included and excluded
The two lists that decide whether quotes are comparable. For a private label quote, ours reads:
Read moreShow less
| Included | Excluded |
|---|---|
| Formula | Designated cap colours or dedicated moulds |
| Standard container and cap | Regulatory registration (CPSR, Responsible Person, CPNP, MoCRA) |
| Your brand label, one-color print | Freight and import duties |
| Printed unit carton | Direct printing on the container below 1,000 units |
| Label printing setup | Courier for samples |
When another quote is lower, look for the pump, the carton, the label setup, and the words "packaging excluded". Ask the manufacturer to put each one on its own line; a manufacturer who can do this knows its costs.
3. Incoterm
The Incoterm says where the manufacturer's responsibility and cost stop.
Read moreShow less
| Term | Meaning | Who pays what |
|---|---|---|
| EXW (Ex Works) | Goods made available at the partner line in Korea | You arrange and pay everything from the door: pickup, export clearance, freight, insurance, import |
| FOB (Free On Board) Korea | Goods delivered on board the vessel, or to the carrier, at the Korean port, export cleared | You pay ocean or air freight, insurance, import clearance and duty |
| DAP (Delivered At Place) | Goods delivered to the named place in your country, not import cleared | You pay import duty and VAT; the seller pays freight |
| DDP | Delivered and import cleared | Seller pays duties; we do not quote DDP without checking the destination's rules |
Our defaults: EXW for OEM and ODM, FOB Korea for the private label price list, DAP for wholesale. An EXW price is always lower than an FOB price for the same goods, because inland transport and export clearance are not in it. Compare on the same term.
4. Payment terms
Ours are 50% to start production, 50% before shipment, by T/T bank transfer. PayPal and Payoneer work for small amounts such as samples, with the fees paid by the buyer. We do not accept letters of credit (L/C).
What to check in any quote: when the deposit triggers production, what is due before shipment, whether bank fees are on your side, and how long the price holds in the quoted currency.
5. Validity
Container and raw material prices move. A quote should carry a validity date; ours states one on every quote. After it, ask for a confirmation rather than assuming the number stands.
6. Sample fee and credit
Our USD 150 sample fee is paid before the sample round and credited in full against the production invoice. It is not refunded if the project stops at samples. On the quote it appears as a negative line against the product total. Free samples with a higher unit price, or a fee that is not credited, are different numbers.
7. Lead time
Two numbers: samples (about 2 weeks per round) and production (2 to 3 months including containers, from artwork approval and deposit). Check what starts the clock. A lead time that starts "after all materials are received" can be much longer than one that starts at deposit, because the containers are the long pole.
8. Regulatory lines
Registration in your market (an EU CPSR and Responsible Person, a US MoCRA listing, a Gulf registration) depends on where you sell, not on the product. We quote it at cost, as separate lines, so that a 300-unit order is not inflated by a fixed cost that would look the same on a 30,000-unit order.
A quote that includes "EU registration" in the unit price, or that says nothing about it, needs a question: which service, which provider, and what happens if you change market.
9. The lines that should not be there
| Red flag | Why it matters |
|---|---|
| One price, no tiers, no Incoterm | You cannot compare it with anything |
| "Packaging included" with no container named | The container decides a third of the cost |
| A certification claimed for the company, not the line | Ask which facility makes your product and what it holds |
| No validity date | The price may not survive the sample round |
| Registration "included" without a provider | Someone is guessing, or it will reappear as a surcharge |
| MOQ far below the category norm for masks or sunscreen | 25,000 for sheet masks and 10,000 for US sunscreen are line limits; a quote for 1,000 sheet masks is either a stock product or a mistake |
| Payment by money transfer services only | Ask for a company bank account |
Read moreShow less
"In our experience, the most useful thing we do at the quote stage is put freight and registration on separate lines, even when the buyer did not ask. The unit price looks the same, and then the buyer compares the total with another quote and sees where the difference really is." — Minjae Lee, Head of Overseas Sales
What a cheap price list usually leaves out
A low unit price is often a short list. Run any price list through this checklist before you compare it with ours; the right-hand column is how each item appears on a BIGPIE C&T quote.
Read moreShow less
| Item | Ask the manufacturer | On a BIGPIE C&T quote |
|---|---|---|
| Printed unit carton | Is a carton included, and is it printed? | Included in the private label price |
| Label and decoration setup | Is label printing setup charged? Direct print? | Label setup included; direct print below 1,000 units not available; custom-printed containers from 5,000, quoted |
| Package design | Who designs the label and carton, and at what cost? | USD 200 by our design team, not credited; free if you bring print-ready artwork |
| Formula development or adjustment fee | Is there a development charge on top of samples? | No separate development fee; the USD 150 sample fee covers the development round |
| PIF, CPSR and market registration | Is EU or US registration in the price, and who provides it? | Not in the unit price; quoted at cost as separate lines |
| Container sourcing | Is the container in the price, and which one? | Standard container and cap included; designated cap colours or dedicated moulds quoted separately |
| Freight and duties | What is the Incoterm, and is freight included? | FOB Korea for private label, EXW for OEM and ODM; freight quoted per shipment; duties yours |
| Sample fee and credit | Is there a fee, and does it come back? | USD 150, credited in full against the production order; not refunded if the project stops at samples |
The full fee list is on the fees page, the included and excluded lists on the private label page, and the price calculator adds the tiers for you.
How to compare three quotes
- Put all three on the same Incoterm. Ask for FOB if one is EXW.
- List included and excluded items for each, and price the gaps (pump, carton, label setup). For OEM and ODM, ask each manufacturer to split the price into bulk formula, container and secondary packaging.
- Add the sample fee, minus any credit.
- Add design if you need it.
- Add registration for your market as a separate line, from each quote or from your own provider.
- Add freight from your forwarder, on the same route.
- Mark each line as one-off or recurring. Samples, design and a CPNP notification are paid once per product; the product total, freight and any annual Responsible Person fee come back on every reorder or every year.
- Compare the totals at the quantity you will actually order, and at the next tier up.
The cost and MOQ guide has worked examples, and the price calculator runs the 4 ready formulas at any tier.

What does FOB Korea mean on a cosmetics quote?
The price covers the goods, export clearance and delivery on board the vessel or to the carrier at the Korean port. Ocean or air freight, insurance, import clearance and duties are yours.
Why is your OEM quote EXW but the private label list FOB?
The private label list is a published price, so we fix the term everyone can compare. OEM and ODM projects vary in packaging and volume, so the default is EXW and we quote FOB or delivered terms when the destination is known.
Does the quote include the sample fee?
The USD 150 sample fee is paid before the sample round and shown as a credit on the production quote.
How long is a quote valid?
Every quote carries its validity date. After it, ask for a confirmation; container and raw material prices move.
Can I negotiate the unit price?
The published private label prices are fixed per tier. The way to lower the unit price is the next tier up: the toner drops from $6.32 at 1,000 to $5.62 at 3,000. OEM and ODM quotes depend on the formula and container, and we show what each choice costs.
Want a quote you can read this way? Send a brief; every line above is on ours, within 24 hours.
Tell us what you want to make.
Send the product, market and quantity. You get a written quote and a formula route within 24 hours.